Port of Ortona: South European Terminal

Client: EURASIA S.r.l.

Services in this project:
  • Concept Design

The project has concerned a terminal container (10 MLN TEUs) located on off-shore platform (around 315 ha) which is realized by caissons, along the perimeter, while the yard is made of plates on piles. The terminal is linked to the mainland by a road and railway bridge (6 road lanes and 4 railway tracks).

 

The project includes:

  • 4 mooring docks for Malaccamax vessels equipped with 'Over Head Bridge' cranes;
  • 1,250 m of quay for transshipment and equipped with 11 ‘24-rows’ StS;
  • Automated Yard equipped with ASCs;
  • Automated handling by AGVs;
  • Rail park for 32 simultaneous block trains (700 m long) and served by ASCs;
  • Power station (100 MW) and gasifier (storage capacity 320,000 cbm);
  • Berth for LNG carrier (160,000 DWT);
  • Gate, office building, workshops, warehouses and Control Tower, marine biology laboratory;
  • Industrial area with two quays (380 m long). 

Other projects related to this area