MILANO
RS Components logistic center
Client: RS Components S.p.A.
Services in this project:
- General and specific construction supervision
- Testing and Commissioning
- Integrated design (CSA and MEP)
The aim of the intervention is the redevelopment of the existing warehouse dedicated to the storage and distribution of goods.
The project includes:
- The creation of a 120 cm high loading platform with respect to the current warehouse floor and the construction of three loading / unloading bays;
- The creation of an internal partition in PVC net in the warehouse in order to create a functional subdivision in two different areas;
- The creation of a new security exit due to the partition mentioned before;
- Remediation and renovation of the roof
Connect with Our Team
Project data
- Country
- Italy
- Location
- Vimodrone
- Year
- 2000 - 2000
- Status
- Completed
Other related projects:
- Logest S.p.A. logistic center
- Expansion of the Sicad industrial plant and redevelopment of existing buildings
- Revamping of the Nestlé Frozen Products plant
- New Production Facility and Office Building
- Redevelopment of the Nestlé Waters Castrocielo production site
- Building renovation and plant engineering of the Bayer Healthcare Manufacturing site
Other projects related to this area
-
-
Uboldo (MI)
Expansion of the Sicad industrial plant and redevelopment of existing buildings
-
Campania
Revamping of the Nestlé Frozen Products plant
-
Lombardy
Building renovation and plant engineering of the Bayer Healthcare Manufacturing site
-
Lombardy
New Production Facility and Office Building
-
Lazio
Redevelopment of the Nestlé Waters Castrocielo production site
-
Lombardy
The Construction of a Production Site
-
Lazio
The Redevelopment of the CFI - FCA logistics hub