New Production Facility and Office Building
Client: TMC ITALIA S.p.A.
Services in this project:
- Preliminary design
- Final design
- Technical design for architecture, structures and plants
- Works Supervision
- Safety Management
The building complex is divided into two adjoining structures:
one dedicated to production functions and the other to the corporate administration and management departments.
The prefabricated production facility covers a total surface area of 12,000 square metres. An additional 3,000 square metres of storage space in the basement is connected by a high-capacity freight elevator for the transport of transformers.
The main façade features partially prefabricated pre-stressed beams to support the overhanging roof extending over 8 metres.
The construction is characterised by prefabricated elements, with one floor above ground level as well as a shed roof. A three-storey above-ground rectangular building is attached to the production building.
The load-bearing framework of the offices is made from standard concrete cast on site, and continuous aluminium window frames form the façade cladding.
Connect with Our Team
Stefania Gennari
Head of Industrial, Pharma & Healthcare Business UnitProject data
- Country
- Italy
- Location
- Lombardy
- Year
- 2006 - 2009
- Status
- Completed
Other related projects:
Other projects related to this area
-
Uboldo (MI)
-
Campania
Revamping of the Nestlé Frozen Products plant
-
Lombardy
Building renovation and plant engineering of the Bayer Healthcare Manufacturing site
-
Lazio
Redevelopment of the Nestlé Waters Castrocielo production site
-
Lombardy
The Construction of a Production Site
-
Lazio
The Redevelopment of the CFI - FCA logistics hub