Client: TMC ITALIA S.p.A.

Services in this project:
  • Preliminary design
  • Final design
  • Technical design for architecture, structures and plants
  • Works Supervision
  • Safety Management

The building complex is divided into two adjoining structures:

one dedicated to production functions and the other to the corporate administration and management departments.

The prefabricated production facility covers a total surface area of 12,000 square metres. An additional 3,000 square metres of storage space in the basement is connected by a high-capacity freight elevator for the transport of transformers.

The main façade features partially prefabricated pre-stressed beams to support the overhanging roof extending over 8 metres.

The construction is characterised by prefabricated elements, with one floor above ground level as well as a shed roof. A three-storey above-ground rectangular building is attached to the production building. 

The load-bearing framework of the offices is made from standard concrete cast on site, and continuous aluminium window frames form the façade cladding.