Fastweb PoP infrastructures

Client: Fastweb S.p.A.

Services in this project:
  • Commissioning
  • Works Supervision
  • Technical design
  • Site research
  • Authorization Practices
  • Preliminary design
  • Project Management
  • Testing
  • Safety coordination during technical stage

Since 2005, DBA PRO. has supported the Client in the implementation of the PoP network by providing the following services:

  • site research on the entire national territory
  • preliminary engineering design
  • authorisation procedures for the transformation of the sites identified in Point Of Presence
  • execution engineering design of the individual sites
  • project management for the development of the various sites and the roll out of the multiple activities across all regions
  • safety coordination during the design and execution phases for each POP site
  • construction management and acting project manager for each POP implementation activity
  • supervision of the works for each of the infrastructures that have been built
  • final acceptance testing and commissioning of each site

 

We then worked side by side with the Client to maintain and implement the PoP infrastructures, defining the technical specifications for the different types of sites to be developed, updating, revising and implementing the infrastructures created to keep them up to date, monitored and efficient in terms of the variety of services provided.

Support was provided for the preparation of the environmental documentation required for the operation of PoPs and their generators.

Engineering services were also delivered for the construction of new PoPs, and energy-saving systems such as free cooling and photovoltaic systems were installed in existing PoPs to improve their efficiency.

We have performed more than 200 activities, ranging from constructing new sites to implementing and expanding existing ones.

Other projects related to this area