Italy
Synchronous condenser installations
Client: ABB/Hitachi Power grid - ANSALDO
Services in this project:
- Final and Technical Design and AS BUILT
These installations regulate the voltage at grid nodes, particularly for renewable energy plants, which are entitled under regulatory standards to feed the grid even when it is least needed. In addition, these installations improve grid security in case of faults.
The engineering design of the plant included all civil works from the connection terminal in the existing power station to the buildings, equipment towers, transformer foundations, cable ducts and cooling system pipework.
Connect with Our Team
Alessandro Bertino
Head of Energy Transmission Business UnitProject data
- Country
- Italy
- Location
- Apulia and Basilicata
- Year
- 2018 - 2022
- Status
- Completed